Maruti Plast

Home – Maruti Plast

Maruti Plast

10, Satvam Ind Park, Dhamatvan, Ahmedabad, Gujarat.

Project Overview

A 55 kW rooftop solar power system was installed for Maruti Plast at its facility in Ahmedabad, Gujarat. The project was implemented to reduce rising electricity costs, improve energy efficiency, and support the company’s shift toward clean and sustainable energy for daily industrial operations.

Project Objectives

The objective of this 55 kW rooftop solar project was to lower operational electricity expenses, ensure a reliable power supply for manufacturing activities, and reduce dependency on grid electricity. The project also aimed to promote environmentally responsible industrial practices by minimizing carbon emissions and delivering long-term financial benefits through renewable energy.

Key Results & Benefits

What We Delivered

We delivered a high-performance 55 kW rooftop solar solution designed to meet the energy requirements of Maruti Plast while ensuring efficiency, durability, and long-term reliability.

Custom Solar Assessment

A detailed site survey was conducted to evaluate rooftop structure, shadow-free areas, and power consumption patterns to design an optimized solar system.

Professional & Hassle-Free Installation

The installation was completed safely and efficiently with minimal disruption to daily operations, following all quality and safety standards.

High-Efficiency Solar Panel Setup

Premium-quality, high-efficiency solar panels were installed to ensure consistent power generation and dependable performance.

Smart Monitoring & Support System

A real-time monitoring system was integrated to track energy generation and system performance, backed by ongoing technical support.

Our Impact

The 55 kW rooftop solar installation enabled Maruti Plast to significantly reduce electricity costs and dependence on grid power. The project contributes to cleaner energy usage, lower carbon emissions, and improved operational efficiency while delivering long-term economic and environmental benefits.

Client Testimonial

“The 55 kW rooftop solar system has helped us reduce electricity costs and improve power reliability for our operations. The entire process was handled professionally, and the installation was completed smoothly with minimal disruption. It has proven to be a valuable long-term investment for our facility.”

Management Team
Maruti Plast